    Musi Pulp Mill
    Complete routine maintenance contract on yearly basis from 1999 - Date Changing of Shell and Type of Lime Kiln in April 2001 Shutdown maintenance service Kiani Kertas
    Replacement of MC Pumps and associated piping in Fibre Line Shutdown maintenance service Indah Kiat Pulp & Paper (IKPP)
    RB 6 Recondition & Upgrade in Jul 2011 - Aug 2011 RB 5 Upgrade Project Replace Superheater, MB 12 Recondition & Shutdown, MB 21 Shutdown Repair Furnace & Fabrication Bottom Ash Conveyor in Jul 2009 - Aug 2009 OB-90 T/H Recondition, RB & VE 11 Annual Shutdown in Jul 2008 - Nov 2008 RB 5 Replace Inlet Ducting ESP, VE - 1A Upgrade Install Mis Eliminator, RB6 Upgrade & Superheater Tube in Apr 2007 - Dec 2007 MB 13 & MB 14 Over Houl Recondition Boiler & Refactory in Dec 2003 - Mar 2004 Retrofit works of RB 5 & RB 11 in July - September 2000 Upgradig of Pulp Line 8 & 9 during March - May 2000 Regular maintenance service since 1998 Shutdown maintenance works Lontar Papyrus Pulp & Paper
    MB 3 Emergency Shutdown in Jun 2011 Replace Bottom Furnace and Maintenance RB 1, Replacement Mist Eliminator VE, RB 1, RB 2, MB 1, MB 2, IMPBIN Annual Shutdown in Jan 2010 RB 1 Shutdown, Mill Wide Shutdown (Mist Eliminator PF 4, IMPBIN, RB 1, RB 2, PCB) in Mar 2009 - Jul 2009 MB 1 Pressure Part Shutdown, RB 2 Shutdown, NK PCB Boiler Shutdown, RB 1 Upgrade in Dec 2007 - Oct 2008 Indorayon / Toba Pulp Lestari Annual Shutdown RB and MF in Nov 2011 Maintenance Service in Nov 2003 - 2005 Riau Andalan Pulp & Paper (RAPP)
    RB 1 Shutdown, Routine Maintenance for Ferry Langgam 1 and Ferry Langgam 2, Repai Work of Inside Sector Cooler Lime Kiln 1, RB 3 Shutdown Work, Lime Kiln 2 Shutdown , Replacement of PD 3 Roof & Structure, Repair of Evaporator 4, RB 5 Shutdown Work in Jan 2011 - Dec 2011 RB 3 Shutdown Work, PB 2 Shutdown Work, RB 2 Shutdown Work, RB 1 Shutdown Work, Evaporator 2 Shutdown Work, Evaporator 4 Shutdown Work, Evaporator 1 Shutdown Work, RB 5 Shutdown in Mar 2010 - Dec 2010 RB 2 Shutdown Work, PB 2 Shutdown Work in Feb 2009 - Sep 2009 Modification of Mist Eliminator Evaporator 2, 3, Ducting Modification at Evaporator 3, RB 1 Shutdown Work, RB 3 Shutdown Work, Upgrade of Piping Fiber Line in Feb 2008 - Jul 2008 PB 1 Shutdown Work, FL 1 Upgrade, RB 2 and Evaporator 2, 3 Shutdown Work, in Sep 2007 - Nov 2007 RB 3 Shutdown Work, PL2D - RB Upgrade, RB 1, 2, 3 Upgrade in Mar 2006 - August 2006 Maintenance Work in Jan 2002 - Dec 2002 Upgrade and Maintenance Work (Mechanical and Piping Fibre Line 1) in May 1998 - Dec 1998
    • Wisma PSM, Jl. Swadaya II / 7 Kota Administrasi Jakarta Selatan
    • +62 21 7803300
    • +62 21 7801054
  • CHEMICAL PLANT
    Pemasangan Peralatan, Instalasi Perpipaan dan Instrumentasi Proyek NPK Granulasi 100.000 MTYP
    • Jl. Prof Muh. Yamin 122 Kab. Gresik
    • +62 31 3959696
    • +62 31 3959696
  • HEAVY INDUSTRIES - POWER PLANT (PEMBANGKIT LISTRIK)
    SPECIFICATION : IWF & H-Beam SS490 (JIS G3106) Angle Section SS400 (JIS G3101) Plate SS490  (JIS G3106) Plate SS400  (JIS G3101) Purlin SPHC ((JIS G3131) Bolt, Nuts & Washer F 10.T ((JIS B1186) Anchor Bolt SR 24(JIS G3112) Welding Electrode Grade E7018 (AWS D1.1)
    • Imam Bonjol 4 Kp. Tangsi RT. 004/006/II Kab. Bekasi
    • +62 21 8901580
    • +62 21 89108031
    • Komplek Industri & Pergudangan Kabupaten Sidoarjo
    • +62 31 8014769
    • +62 31 8014768
    • Komplek Industri & Pergudangan Kabupaten Sidoarjo
    • +62 31 8014769
    • +62 31 8014768
  • HEAT RECOVERY STEAM GENERATOR (HRSG)- CILEGON FABRICATORS
    Capacity: 6,000 ton per year for total module assembly Facilities: Under roof workshop    : 8,829 m² cover all activities for Finning and Harp Fabrication Common Devices         :2 sets of  Finning Machine, Tube Bender, Equipment for  Surface  preparation for tube, Welding Machine, facilities for  Hydro Test and Heat  Treatment for Harp.
    • Jl. Raya Bojonegara ,Argawana, Kota Serang
    • +62 254 5750068
    • +62 254 5750069
  • KONVERSI HSD-MFO PLTD MAROS SULSEL
    The Power Generation Business Unit currently provides engineering, procurement and construction services for power plant, IPP development, energy conversion, supply spare parts. It produces micro/mini hydro power plant, diesel power plant and gas. Among the customers are PT Pertamina (Persero), PT Perusahaan Listrik Negara (Persero), PT Maros Energy, PT SK Keris.
    • Jl. Raya Bekasi Narogong Km. 19,5 Kab. Bogor
    • +62 21 8232323
    • +62 21 8231150
  • KONVERSI HSD-MFO PLTD TRISAKTI BANJARMASIN
    The Power Generation Business Unit currently provides engineering, procurement and construction services for power plant, IPP development, energy conversion, supply spare parts. It produces micro/mini hydro power plant, diesel power plant and gas. Among the customers are PT Pertamina (Persero), PT Perusahaan Listrik Negara (Persero), PT Maros Energy, PT SK Keris.
    • Jl. Raya Bekasi Narogong Km. 19,5 Kab. Bogor
    • +62 21 8232323
    • +62 21 8231150
  • CHIMNEY
    DCP experience in various power plant projects in Indonesia has successfully made DCP as one of PLN main options in development of their projects. With platework facilities (rolling & bending machines) to make precicion both cylindrical and conical (tapered) dimension, Chimney as a major part in the construction of power plants and mostly industrial building in Indonesia has become an easy thing for DCP to be done.