Direktori Produk

Filter Pencarian

Negara

Indonesia (35)

USA (31)

Semua Negara (66)

Kategori Keanggotaan

Platinum (1)

Free (23)

Semua Kategori Member (24)

Kategori Perusahaan

Manufacturer (44)

Distributor (1)

Supplier (10)

Contractor (11)

Semua Kategori (66)


Reset pencarian

Produk terkait

  • KAWAT BRONJONG SNI
    Dear Customer. CV. DUA PUTRA PETIR MENJUAL KAWAT BRONJONG PABRIKASI / KAWAT BRONJONG MESIN , KAWAT BRONJONG SNI , KAWAT BRONJONG MANUAL .

    KEGUNAAN KAWAT BRONJONG :
    - PENCEGAHAN EROSI PADA TANGGUL SUNGAI
    - PELINDUNG KELUARAN GORONG-GORONG
    - PELINDUNG PENYANGGA JEMBATAN
    - PERLINDUNGAN GARIS PANTAI

    MENYEDIAKAN
    - BRONJONG SNI 03-0090-1999 YANG PRODUKSI MESIN ( BRONJONG PABRIKASI)
    - BRONJONG KAWAT MANUAL
    - BRONJONG PVC SNI 03-3046-1992 ( PVC COATED GABION )
    - GEOTEXTILE 150 GR , GEOTEXTILE 200 GR , GEOTEXTILE 250 GR , GEOTEXTILE 300 GR
    - WIRE NETTING DENGAN LEBAR 1 METER SAMPAI 4 METER DENGAN PANJANG 50 M SAMPAI 150 M
    - SACK GABION DENGAN PANJANG MULAI 2 METER SAMPAI 4 METER DENGAN DIAMETER MULAI DARI 0.45 METER SAMPAI 0.85 METER

    HARGA KAWAT BRONJONG ( HARGA GABION ) PER 17 PEBRUARI 2014 :
    - 2 X 1 X 0.5 ( 2.7 MM) : RP 195.000 ( PRODUKSI MESIN)
    - 2 X 1 X 0.5 ( 2.7 MM) : RP 155.000 ( PRODUKSI MANUAL)
    - 2 x 1 x 1 ( 2.7 MM) : RP 285.000 ( PRODUKSI MESIN)
    - 2 X 1 X 1 ( 2.7 MM) : RP 240.000 ( PRODUKSI MANUAL)
    - 2 x 1 x 0.5 ( 3 MM) : RP 245.000 ( PRODUKSI MESIN )

    HARGA BRONJONG MURAH MULAI DARI HARGA RP 85.000

    BERIKUT INI INFORMASI HARGA BRONJONG PVC PER TANGGAL 24 OKTOBER 2012 :
    - PVC 2 X 1 X 0.5 ( 2.7 MM) : RP 330.000 ( PRODUKSI MESIN )
    - PVC 2 X 1 X 1 ( 2.7 MM) : RP 520.000 ( PRODUKSI MESIN ) CV.DUA PUTRA PETIR Bukit Palma C5/33 Citraland Utara – Surabaya Telp. 03188000026/27 Telp . 03317406677 / 7407380 Fax : 031-7417127 Email: duaputrapetir@gmail.com Website : www.besisurabaya.com  www.duaputrapetir.co.id   www.duaputrapetir.indonetwork.co.id , www.jualpolycarbonate.indonetwork.co.id  www.jualbesisurabaya.indonetwork.co.id www.besibetonsnisurabaya.blogspot.com www.besikanal.blogspot.com  www.tandonairpenguin.blogspot.com  www.tandonairmurah.blogspot.com www.duaputrapetir.blogspot.com
    • Bukit Palma C5/33 Kota Surabaya
    • +62 31 7406677
    • +62 31 7417127
  • QUATTRO COLUMN FORMWORK (PERI PRODUCTS)
    PERI QUATTRO columns can be moved as complete units i.e. four column elements together. Advantages   PERI column Quatro Can Save Time On When Used   Quatro column requires no loose parts during the process of shuttering and striking. Element - element in the column can be opened and closed with little effort.   In Column Quatro cross section can be Adjusted Quickly.   The size of the column cross-section of 20 x 20 cm to 60 x 60 cm in increments of 5 cm can be quickly formed by using Quatro regardless whether it is a square column or rectangular columns.   Using the Wheel Transport QUATTRO   With the use of wheeled transport, PERI QUATTRO Column formwork to be more cost effective. formwork Operators would be in a position for shuttering and striking manually and without the need for cranes. The completed formwork units can also be moved from column to column to another by using arms.   QUATTRO Column Safe For Work In All Conditions Altitude   With a platform and access ladder that has been integrated with a ladder cage serves to maintain the safety of the operator while on the move. Even when moving, safety components remain securely connected to the formwork.
    • Jl. Penjernihan No.40 Kota Administrasi Jakarta Pusat
  • TURRET / TRAVELLER ON WHEELS
    This track portal-type traveller can be used to handle and transport large formwork. Advantages Can be moved freely Portal-type travellers running on tracks used with metal form equipment designed to line road, rail, hydraulic and large-diameter tunnels using both single-section self-supporting forms and multi-section self-supporting telescopic forms mean that the equipment can travel freely both during the concrete laying stage and during form advancement. Secured with conventional system or self-reacting system The forms can be secured to the base with conventional systems or by the new self-reacting system integrated with the portal-type traveller. CIFA supplies forms for laying base walls, stop-ends, covering rings and coentralized air- or electricity o operated vibration plant, and integrated concrete laying systems. Used to handle medium and large diameter steel formwork Medium and large diameter steel formworks elements 6 to 15 meters long are handled and transported with CIFA portal-type traveller running on tracks. Using hydraulic system for movement All form movements are effected with hydraulic cylinders, as are the transverse and angular centring operations and positioning of the stop-end if required. The portal-type travellers are equipped with hydraulic motors with direct or chain drive.
    • Jl. Penjernihan No.40 Kota Administrasi Jakarta Pusat
  • MULTIFLEX GIRDER SLAB FORMWORK (PERI PRODUCTS)
    The Flexible Slab Formwork System.   Large Spacings   Using the universal, rigid and longlasting GT 24 lattice girder allows large spacings and reduces the number of components.   Even Suited for thin slab   The VT 20K girder with its high-grade web board is the economical way of supporting thinner slabs.   Easy to adjust   MULTIFLEX can be easily adapted by telescoping the girders.   Choise of plywood   Free choice of plywood for the customer.
    • Jl. Penjernihan No.40 Kota Administrasi Jakarta Pusat
  • TUNNEL LINING EQUIPMENT
    Blind-end tunnel excavation technologies using mills or shields. Advantages CIFA Provides Pre-cast Lining Production System The new blind-end tunnel excavation technologies using mills or shields require the section excavated to be supported with precast concrete rings. The special metal forms designed for the production of these rings require machine tool work on the entire surface in contact with the concrete, and special dismantling joints. CIFA supplies the entire precast lining production system, with integrated automation of mixing, transport and laying of the concrete in forms, together with handling and steam curing of the linings.
    • Jl. Penjernihan No.40 Kota Administrasi Jakarta Pusat
  • VARIO GT 24 GIRDER WALL FORMWORK (PERI PRODUCTS)
    The variable girder wall formwork system with the proven lattice girder PERI GT 24. Advantages   Steel and Cap   The rivetted steel cap strengthens the end of the girder, reduces flange splitting and prevents the end being sawn off accidentally.   Applications/Functionality   VT 20K Girder Formwork used for all areas of the establishment,especially at Walls,Columns, Slab and the establishment of special formwork.   As a Diversion Load Pressure From Concrete   VT 20K is used to build the wall formwork elements. VT 20K serves to support the plywood that has direct contact with the concrete for pavement. VT 20K shifted from concrete to steel pressure Walers that support the opposite side of the plywood. VT 20K and Steel Waler connected via Hook Strap.   As a Secondary Beams   VT 20K girder is used as the support provided by the crosshead or clawhead, or direct head prop Plate slab. It is also used as a secondary beam to transfer loads to the plate girder.   Lightweight Easily Assembled and Disassembled   Because light, VT 20K basically move, assembled and disassembled by hand. The damage does not occur through the use of the machine. Damage can occur if the VT 20K fell to the ground from great heights or shortened by means of a saw.   Easy To Saved   VT 20K is stored in a horizontal position. The entire surface of the VT 20K to be supported to avoid damage to a surface.
    • Jl. Penjernihan No.40 Kota Administrasi Jakarta Pusat
  • RORO HEAVY DUTY SHORING S40
    Robust, heavy duty shoring with normal scaffolding couplers to make trusses or trestles with variable bases. Advantages Insensitive to settlement Insensitive to the small wind surface Insensitive to central load introduction to a ball socket in the base Available in tested column load types
    • Jl. Penjernihan No.40 Kota Administrasi Jakarta Pusat
  • LARGE SECTIONS EQUIPMENT
    CIFA's essential steel formwork equipments for caves and large diameters. Advantages Required equipments are included CIFA products also include the essential steel formwork equipment for caves and large diameters, where experience, know-how and manufacturing capacity are essential to meet the requirements of the client company - low running costs, the right choice of materials and equipment, design analysis and ergonomic and environmental features.
    • Jl. Penjernihan No.40 Kota Administrasi Jakarta Pusat
  • JOB-SITE EQUIPMENT AND SYSTEMS
    CIFA's job-site equipments and systems have a constantly developed standard. Advantages Assisting customers using up-to-date standards Self-raising service platforms and carriages with hydraulic booms designed for laying metal ribs and concrete slabs are some of the special items of equipment included in CIFA's constantly developing standard production line. CIFA know-how is available to assist customers in customising and engineering all their requirements.
    • Jl. Penjernihan No.40 Kota Administrasi Jakarta Pusat
  • LICO LIGHTWEIGHT COLUMN FORMWORK (PERI PRODUCTS)
    PERI LICO is the lightweight column formwork for crosssections of 20 cm x 20 cm up to 60 cm x 60 cm in 5 cm increments. With additional ties, shear wall cross-sections up to 60 cm x 130 cm are possible. All elements can be moved by hand and the connecting parts are permanently attached to the panels which means they cannot be lost.
    • Jl. Penjernihan No.40 Kota Administrasi Jakarta Pusat