Negara

Indonesia (73)

Semua Negara (73)

Kategori Member

Platinum (15)

Semua Kategori Member (15)

Kategori Perusahaan

Manufacturer (8)

Fabricator (7)

Contractor (58)

Semua Kategori (73)

Power plant

Konten Dimensi Produk belum tersedia

Konten Indikasi Harga belum tersedia

Produk terkait

  • HEAT RECOVERY STEAM GENERATOR (HRSG)- CILEGON FABRICATORS
    Capacity: 6,000 ton per year for total module assembly Facilities: Under roof workshop    : 8,829 m² cover all activities for Finning and Harp Fabrication Common Devices         :2 sets of  Finning Machine, Tube Bender, Equipment for  Surface  preparation for tube, Welding Machine, facilities for  Hydro Test and Heat  Treatment for Harp.
    • Jl. Raya Bojonegara ,Argawana, Kota Serang
    • +62 254 5750068
    • +62 254 5750069
  • POWER PLANT
    Palabuhan Ratu Power Plant 3x300 - 400 MW, West Java Capacity: 3 x 300-400 MW  Year: Aug. 2007 – Apr. 2014 Owner: PLN  Clients : Shanghai Electric Corporation / Maxima Infrastructure Scope of Work: Installation of Civil Work, Mechanical Part, Electrical and Instrument Part for 3x300 MW (Boiler, Steam Turbine, Piling BOP, Electrical & Instrument Work) Civil, Erection Steel Structure, Erection work of Mechanical and Electrical  Gresik Combined Cycle Plant Project Capacity: 1,500 MW  Year: Mar. 91 – Jan. 94 Owner: PLN  Clients : Mitsubishi Corporation, Cockerill M.I. Scope of Work: Installation of 3x200 MW Steam Turbine Installation of 9x100 MW Gas Turbine Installation of 9x160 t/h Boilers and auxiliaries Supply & fabricate pipe racks, structural steel, fire protection system piping. Supply & fabricate ducts, casings & chimney Grati Combined Cycle Power Plant Project Capacity : 800 MW  Year : Nov.94 – Jan.97  Owner : PLN  Clients : Mitsubishi Heavy Industries Scope of Work : EPC of 4 nos. HSD Oil Tanks Installation of Gas & Steam Turbines Installation of 3 units Boiler and Auxiliaries Fabrication of Ducting,Casing & Chimney for 3 units Boiler Assembly of Stack bottom Piping for Fire-fighting Main pipes for HRSG Paiton Steam Power Plant Units 5 & 6 Project Project : PAITON STEAM POWER PLANT Units 5&6  Capacity : 2x660 MW Coal-Fired  Year : Jan.96 – Jul.99  Owner : PT. Jawa Power  Clients : PT. Jurong Engineering Lestari Scope of Work: Installation of Boilers and Auxiliaries Mechanical & Electrical works for the Balance of Plant  Suralaya Steam Power Plant Units 5,6,7 Project Capacity : 3x660 MW Coal-Fired  Year : Mar.94 – Nov.97  Owner : PLN  Clients : Marubeni Corp./TDK Mitsubishi Heavy Industries PT.Basuki Pratama Nuova Cimimontubi Scope of Work: Installation of 3 Boilers and Electrostatic Precipitators Installation of Steam Turbines Installation of Stack Liner Supply & install Fire Fighting System
    • Wisma PSM, Jl. Swadaya II / 7 Kota Administrasi Jakarta Selatan
    • +62 21 7803300
    • +62 21 7801054
  • REFRACTORY BOILER POWER PLANT
    Kami menawarkan jasa untuk instalasi Refractory untuk Boiler pada Power Plant
    • Jl. Cikini Raya No. 35 Kota Adm. Jakarta Pusat
    • +62 21 31924183
    • +62 21 3102070
  • POWER STATION BUILDING - MEGA KARYA SAMPURNA
    Description
    A power station is an industrial facility for electric generator. The power station works by converting energy, most of them come from mechanical energy and converted into electrical energy.  The building construction of the power station is depend on the inquiry from the customer and steel is the most employed material in building a power station. We provide precision in dimension for every power plant parts, excellent quality and exact amount of the part.
    Application
    Pressure Vessel, Power Plant Structure, Pipe (energy conveyor), and Power Plant Building.
    • Jl Boulevard Raya Blok CN3/18 Kota Adm. Jakarta Utara
    • +62 812 89 810990
    • +62 21 45846961
  • EPC PLTD PANBILL BATAM
    The Power Generation Business Unit currently provides engineering, procurement and construction services for power plant, IPP development, energy conversion, supply spare parts. It produces micro/mini hydro power plant, diesel power plant and gas. Among the customers are PT Pertamina (Persero), PT Perusahaan Listrik Negara (Persero), PT Maros Energy, PT SK Keris.
    • Jl. Raya Bekasi Narogong Km. 19,5 Kab. Bogor
    • +62 21 8232323
    • +62 21 8231150
  • KONVERSI HSD-MFO PLTGU TAMBAK LOROK-SEMARANG
    The Power Generation Business Unit currently provides engineering, procurement and construction services for power plant, IPP development, energy conversion, supply spare parts. It produces micro/mini hydro power plant, diesel power plant and gas. Among the customers are PT Pertamina (Persero), PT Perusahaan Listrik Negara (Persero), PT Maros Energy, PT SK Keris.
    • Jl. Raya Bekasi Narogong Km. 19,5 Kab. Bogor
    • +62 21 8232323
    • +62 21 8231150
  • KONVERSI HSD-MFO PLTD GN. MALANG BALIKPAPAN
    The Power Generation Business Unit currently provides engineering, procurement and construction services for power plant, IPP development, energy conversion, supply spare parts. It produces micro/mini hydro power plant, diesel power plant and gas. Among the customers are PT Pertamina (Persero), PT Perusahaan Listrik Negara (Persero), PT Maros Energy, PT SK Keris.
    • Jl. Raya Bekasi Narogong Km. 19,5 Kab. Bogor
    • +62 21 8232323
    • +62 21 8231150
  • KONVERSI HSD-MFO PLTD POKKA AMBON
    The Power Generation Business Unit currently provides engineering, procurement and construction services for power plant, IPP development, energy conversion, supply spare parts. It produces micro/mini hydro power plant, diesel power plant and gas. Among the customers are PT Pertamina (Persero), PT Perusahaan Listrik Negara (Persero), PT Maros Energy, PT SK Keris.
    • Jl. Raya Bekasi Narogong Km. 19,5 Kab. Bogor
    • +62 21 8232323
    • +62 21 8231150
  • KONVERSI HSD-MFO PLTD TRISAKTI BANJARMASIN
    The Power Generation Business Unit currently provides engineering, procurement and construction services for power plant, IPP development, energy conversion, supply spare parts. It produces micro/mini hydro power plant, diesel power plant and gas. Among the customers are PT Pertamina (Persero), PT Perusahaan Listrik Negara (Persero), PT Maros Energy, PT SK Keris.
    • Jl. Raya Bekasi Narogong Km. 19,5 Kab. Bogor
    • +62 21 8232323
    • +62 21 8231150
  • PLTD PETUNG PENAJAM
    The Power Generation Business Unit currently provides engineering, procurement and construction services for power plant, IPP development, energy conversion, supply spare parts. It produces micro/mini hydro power plant, diesel power plant and gas. Among the customers are PT Pertamina (Persero), PT Perusahaan Listrik Negara (Persero), PT Maros Energy, PT SK Keris.
    • Jl. Raya Bekasi Narogong Km. 19,5 Kab. Bogor
    • +62 21 8232323
    • +62 21 8231150